skip to main content

University Statement–Rose Hill Power Supply

0

Sunday, March 4, 2007—UPDATE: Regular electrical power will be restored by this evening to all buildings affected by flooding on Fordham’s Rose Hill campus. Since Friday, electrical power has been provided to the affected buildings by generators; power in those buildings will be briefly shut down this afternoon in order to switch back to normal service.

Power was temporarily lost to four University buildings at Rose Hill on Friday, March 2, because of flooding. University operations staff  quickly supplied the affected buildings with electricity via backup generators, which have been supplying power since then. All affected students were contacted by the University’s Office of Residential Life, which coordinated any necessary assistance. Class schedules were unaffected.

Share.

Comments are closed.